BRICKLAYING
BRICKLAYING PHASE 1: 3 Weeks |
Erect and dismantle scaffolding |
Identify tools and equipment |
Build a half brick wall between 2 columns |
Build a half brick corner in stretcher bond |
Build a full brick corner in stretcher bond |
Build a lead-out wall in stretcher bond |
Build a full brick isolated pier |
Plaster a blank wall |
BRICKLAYING PHASE 2: 4 Weeks |
Build face brick between 2 columns |
Build face brick quoin |
Build an isolated pier in face brick |
Build in a steel door and window frame |
Build an arch with the use of a profile |
Plaster a wall with reveals |
Install wall tiles |
Set out and lay floor tiles |
BRICKLAYING PHASE 3: 3 Weeks |
Setting out of super structure |
Bonding of super structure (English bond) |
Main structure stretcher bond |
Building in of a door frame |
Building in of a window frame |
Raking back of brickwork |
Roller course window sill |
Face brickwork |