BRICKLAYING
| BRICKLAYING PHASE 1: 3 Weeks |
| Erect and dismantle scaffolding |
| Identify tools and equipment |
| Build a half brick wall between 2 columns |
| Build a half brick corner in stretcher bond |
| Build a full brick corner in stretcher bond |
| Build a lead-out wall in stretcher bond |
| Build a full brick isolated pier |
| Plaster a blank wall |
| BRICKLAYING PHASE 2: 4 Weeks |
| Build face brick between 2 columns |
| Build face brick quoin |
| Build an isolated pier in face brick |
| Build in a steel door and window frame |
| Build an arch with the use of a profile |
| Plaster a wall with reveals |
| Install wall tiles |
| Set out and lay floor tiles |
| BRICKLAYING PHASE 3: 3 Weeks |
| Setting out of super structure |
| Bonding of super structure (English bond) |
| Main structure stretcher bond |
| Building in of a door frame |
| Building in of a window frame |
| Raking back of brickwork |
| Roller course window sill |
| Face brickwork |