PLUMBING PLUMBING PHASE 1: 3 Weeks Erect and dismantle scaffolding Identify tools and equipment Basic sheet metal work Soldering of sheet metal work Cut, thread and couple galvanized pipe Bend and couple copper tube Remove and replace tap and cistern washers Install gutters and down pipes Install a cistern and toilet Install a hand basin Install a urinal Cleaning of drains Repairs to galvanized pipes Repairs to copper pipes PLUMBING PHASE 2: 4 Weeks Interpret dimensional drawings Construct chimney flashing Develop and fabricate a vent pipe flashing Install a cold water cistern Install a wash hand basin and fittings (pedestal) Install a toilet and cistern (cast iron upright) Install a shower Install a bidet Install gutters, brackets and down pipe Lay sewer and storm water drains Install a combination geyser PLUMBING PHASE 3: 3 Weeks Install a high pressure geyser Install a shower Cut, bend and assemble copper pipe work Cut, bend and assemble galvanized pipe work Install a stainless steel sink Install toilet and cistern Install a bath Install a push-through geyser Install a below-ground draining system Develop and fabricate a vent pipe flashing Fabricate and install chimney flashing